What is BIM?s Level of Developments (LOD)?

What is BIM?s Level of Developments (LOD)?


The Degree of Development (LOD) framework is a system used in Building Information Modeling (BIM) to define the level of detail and accuracy of information contained inside a BIM model at different stages of a project. The LOD framework provides a common language and understanding among project stakeholders regarding the degree of information and model reliability.

You can find different LOD specifications available, but the most commonly used framework is the LOD Specification developed by the American Institute of Architects (AIA), the Construction Specifications Institute (CSI), and the National Institute of creating Sciences (NIBS). The AIA LOD Specification defines six degrees of development:

LOD 100: Conceptual Design

As of this level, the BIM model represents basic massing, volumes, and conceptual design intent. It really is used to convey the entire design concept without specific details or accurate dimensions.

LOD 200: Schematic Design

In this stage, the BIM model provides more detailed information, including approximate sizes, shapes, and locations of building elements. https://surveyorworcestershire.co.uk/best-building-information-modelling-worcestershire/ serves as a tool for design development and additional analysis.

LOD 300: Design Development

At LOD 300, the BIM model becomes more refined and detailed. It offers specific sizes, shapes, and orientations of building elements. It incorporates information about systems, assemblies, and connections to support design development and coordination.

LOD 350: Construction Documentation

At this level, the BIM model includes accurate and detailed information necessary for construction documentation and coordination. It incorporates specific products, quantities, and assemblies essential for construction.

LOD 400: Construction Stage

LOD 400 represents the BIM model with as-built information during the construction phase. It offers actual product and material details, precise dimensions, and specific installation methods. It serves as a reference for construction teams.

LOD 500: As-Built Stage

At this final level, the BIM model reflects the specific conditions of the built project. It offers accurate and verified as-built information, such as for example installed equipment, systems, and components.

It's important to remember that the LOD definitions may vary slightly according to the project or organization. The LOD framework helps project stakeholders align their expectations concerning the degree of information and detail in a BIM model at different stages of a project. This facilitates effective collaboration, decision-making, and coordination through the entire project lifecycle.

Report Page