Underground Tubes
💣 👉🏻👉🏻👉🏻 ALL INFORMATION CLICK HERE 👈🏻👈🏻👈🏻
Try mSpy Phone Tracker for Your Kid's Safety
Touch a word or the button for sound
Click on a word or on the button for sound
Click on a word or on the red button for sound
Underground / Subway / Metro / Tube
A passenger railway going inside an urban area was called the METROPOLITAN RAILWAY (urban train system), in modern English: METRO. The first metro was opened in London and later most of it was soon built underground (under the city), so it was then called THE UNDERGROUND, even to this day. But in general, in the UK we usually call it THE TUBE, because it mostly goes (or went) inside a tunnel, a tube.
In America the first metro was built in New York, and it was called SUBWAY because it was built mostly under the streets (sub= under / way= road), since Manhattan street plan is quite a regular grill and it was easy to do so.
We use the word METRO to talk about most of the foreign underground systems in other cities: Paris, Moscow, Madrid, Shanghai, Beijing... but we use "subway" for other cities like Tokyo, and for example in Seoul it is "Seoul Metropolitan Subway" (not sure if people there simply says "metro" or "subway").
Glasgow, though it is in Britain, uses the word "subway", but in the rest of Great Britain "subway" is an underground passage for pedestrians (to cross under a road or street). In America "metro" is usually short for "metropolitan area" (a big city and its area of influence).
= the tube (or the underground)
= the subway
rest of the world= the metro
This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept Read more
Перевести · Check for planned line closures and service changes. Tube improvements. First & last Tubes. Art on the Underground. Poems on the Underground…
https://en.m.wikipedia.org/wiki/London_Underground
Daily ridership: 5 million
Number of lines: 11
Number of stations: 270 served (260 owned)
System length: 402 km (250 mi)
Railway
As of 2017, the Underground serves 270 stations. Sixteen Underground stations are outside London region, eight on the Metropolitan line and eight on the Central line. Of these, five (Amersham, Chalfont & Latimer, Chesham, and Chorleywood on the Metropolitan line, and Epping on the Central line), are beyond the M25 London Orbital motorway. Of the 32 London boroughs, six (Bexley, Bromley, Croydon,
Railway
As of 2017, the Underground serves 270 stations. Sixteen Underground stations are outside London region, eight on the Metropolitan line and eight on the Central line. Of these, five (Amersham, Chalfont & Latimer, Chesham, and Chorleywood on the Metropolitan line, and Epping on the Central line), are beyond the M25 London Orbital motorway. Of the 32 London boroughs, six (Bexley, Bromley, Croydon, Kingston, Lewisham and Sutton) are not served by the Underground network, while Hackney has Old Street (on the Northern line Bank branch) and Manor House (on the Piccadilly line) only just inside its boundaries. Lewisham used to be served by the East London line (stations at New Cross and New Cross Gate). The line and the stations were transferred to the London Overground network in 2010.
London Underground's eleven lines total 402 kilometres (250 mi) in length, making it the seventh longest metro system in the world. These are made up of the sub-surface network and the deep-tube lines. The Circle, District, Hammersmith & City, and Metropolitan lines form the sub-surface network, with railway tunnels just below the surface and of a similar size to those on British main lines, converging on a circular bi-directional loop around zone 1. The Hammersmith & City and Circle lines share stations and most of their track with each other, as well as with the Metropolitan and District lines. The Bakerloo, Central, Jubilee, Northern, Piccadilly, Victoria and Waterloo & City lines are deep-level tubes, with smaller trains that run in two circular tunnels (tubes) with a diameter about 11 feet 8 inches (3.56 m). These lines have the exclusive use of a pair of tracks, except for the Uxbridge branch of the Piccadilly line, which shares track with the District line between Acton Town and Hanger Lane Junction and with the Metropolitan line between Rayners Lane and Uxbridge; and the Bakerloo line, which shares track with London Overground's Watford DC Line for its aboveground section north of Queen's Park.
Fifty-five per cent of the system runs on the surface. There are 20 miles (32 km) of cut-and-cover tunnel and 93 miles (150 km) of tube tunnel. Many of the central London underground stations on deep-level tube routes are higher than the running lines to assist deceleration when arriving and acceleration when departing. Trains generally run on the left-hand track. In some places, the tunnels are above each other (for example, the Central line east of St Paul's station), or the running tunnels are on the right (for example on the Victoria line between Warren Street and King's Cross St. Pancras, to allow cross-platform interchange with the Northern line at Euston).
The lines are electrified with a four-rail DC system: a conductor rail between the rails is energised at −210 V and a rail outside the running rails at +420 V, giving a potential difference of 630 V. On the sections of line shared with mainline trains, such as the District line from East Putney to Wimbledon and Gunnersbury to Richmond, and the Bakerloo line north of Queen's Park, the centre rail is bonded to the running rails.
The average speed on the Underground is 20.5 mph (33.0 km/h). Outside the tunnels of central London, many lines' trains tend to travel at over 40 mph (64 km/h) in the suburban and countryside areas. The Metropolitan line can reach speeds of 62 mph (100 km/h).
Lines
The London Underground was used by 1.357 billion passengers in 2017/2018.
Services using former and current main lines
The Underground uses several railways and alignments that were built by main-line railway companies.
• Bakerloo line: Between Queen's Park and Harrow & Wealdstone this runs over the Watford DC Line also used by London Overground, alongside the London & North Western Railway (LNWR) main line that opened in 1837. The route was laid out by the LNWR in 1912–15 and is part of the Network Rail system.
• Central line: The railway from just south of Leyton to just south of Loughton was built by Eastern Counties Railway in 1856 on the same alignment in use today. The Underground also uses the line built in 1865 by the Great Eastern Railway (GER) between Loughton to Ongar via Epping. The connection to the main line south of Leyton was closed in 1970 and removed in 1972. The line from Epping to Ongar was closed in 1994; most of the line is in use today by the heritage Epping Ongar Railway. The line between Newbury Park and Woodford junction (west of Roding Valley) via Hainault was built by the GER in 1903, the connections to the main line south of Newbury Park closing in 1947 (in the Ilford direction) and 1956 (in the Seven Kings direction).
• Central line: The line from just north of White City to Ealing Broadway was built in 1917 by the Great Western Railway (GWR) and passenger service introduced by the Underground in 1920. North Acton to West Ruislip was built by GWR on behalf of the Underground in 1947–8 alongside the pre-existing tracks from Old Oak Common junction towards High Wycombe and beyond, which date from 1904. As of May 2013 , the original Old Oak Common junction to South Ruislip route has one main-line train a day to and from Paddington.
• District line: South of Kensington Olympia short sections of the 1862 West London Railway (WLR) and its 1863 West London Extension Railway (WLER) were used when District extended from Earl's Court in 1872. The District had its own bay platform at Olympia built in 1958 along with track on the bed of the 1862–3 WLR/WLER northbound. The southbound WLR/WLER became the new northbound main line at that time, and a new southbound main-line track was built through the site of former goods yard. The 1872 junction closed in 1958, and a further connection to the WLR just south of Olympia closed in 1992. The branch is now segregated.
• District line: The line between Campbell Road junction (now closed), near Bromley-by-Bow, and Barking was built by the London, Tilbury & Southend Railway (LTSR) in 1858. The slow tracks were built 1903–05, when District services were extended from Bow Road (though there were no District services east of East Ham from 1905 to 1932). The slow tracks were shared with LTSR stopping and goods trains until segregated by 1962, when main-line trains stopped serving intermediate stations.
• District line: The railway from Barking to Upminster was built by LTSR in 1885 and the District extended over the route in 1902. District withdrew between 1905 and 1932, when the route was quadrupled. Main-line trains ceased serving intermediate stations in 1962, and the District line today only uses the 1932 slow tracks.
• District line: The westbound track between east of Ravenscourt Park and Turnham Green and Turnham Green to Richmond (also used by London Overground) follows the alignment of a railway built by the London & South Western Railway (LSWR) in 1869. The eastbound track between Turnham Green and east of Ravenscourt Park follows the alignment built in 1911; this was closed 1916 but was re-used when the Piccadilly line was extended in 1932.
• District line: The line between East Putney and Wimbledon was built by the LSWR in 1889. The last scheduled main-line service ran in 1941 but it still sees a few through Waterloo passenger services at the start and end of the daily timetable. The route is also used for scheduled ECS movements to/from Wimbledon Park depot and for Waterloo services diverted during disruptions and track closures elsewhere.
• Hammersmith & City: Between Paddington and Westbourne Park Underground station, the line runs alongside the main line. The Great Western main line opened in 1838, serving a temporary terminus the other side of Bishop's Road. When the current Paddington station opened in 1854, the line passed to the south of the old station. On opening in 1864, the Hammersmith & City Railway (then part of the Metropolitan Railway) ran via the main line to a junction at Westbourne Park, until 1867 when two tracks opened to the south of the main line, with a crossing near Westbourne Bridge, Paddington. The current two tracks to the north of the main line and the subway east of Westbourne Park opened in 1878. The Hammersmith & City route is now completely segregated from the main line.
• Jubilee line: The rail route between Canning Town and Stratford was built by the GER in 1846, with passenger services starting in 1847. The original alignment was quadrupled "in stages between 1860 and 1892" for freight services before the extra (western) tracks were lifted as traffic declined during the 20th century, and were re-laid for Jubilee line services that started in 1999. The current Docklands Light Railway (ex-North London line) uses the original eastern alignment and the Jubilee uses the western alignment.
• Northern line: The line from East Finchley to Mill Hill East was opened in 1867, and from Finchley Central to High Barnet in 1872, both by the Great Northern Railway.
• Piccadilly line: The westbound track between east of Ravenscourt Park and Turnham Green was built by LSWR in 1869, and originally used for eastbound main-line and District services. The eastbound track was built in 1911; it closed in 1916 but was re-used when the Piccadilly line was extended in 1932.
Main line services using LU tracks
Some tracks now in London Underground ownership remain in use by main line services.
• District line – East Putney to Wimbledon, used by South Western Railway on through, ECS and diverted services
• Metropolitan line – Harrow-on-the-Hill to Amersham, used by Chiltern Railways Marylebone to Aylesbury/Aylesbury Vale services
Trains
London Underground trains come in two sizes, larger sub-surface trains and smaller deep-tube trains. Since the early 1960s all passenger trains have been electric multiple units with sliding doors and a train last ran with a guard in 2000. All lines use fixed length trains with between six and eight cars, except for the Waterloo & City line that uses four cars. New trains are designed for maximum number of standing passengers and for speed of access to the cars and have regenerative braking and public address systems. Since 1999 all new stock has had to comply with accessibility regulations that require such things as access and room for wheelchairs, and the size and location of door controls. All underground trains are required to comply with The Rail Vehicle Accessibility (Non Interoperable Rail System) Regulations 2010 (RVAR 2010) by 2020.
Stock on sub-surface lines is identified by a letter (such as S Stock, used on the Metropolitan line), while tube stock is identified by the year of intended introduction (for example, 1996 Stock, used on the Jubilee line).
Depots
The Underground is served by the following depots:
• Bakerloo: Stonebridge Park, Queen's Park, London Road
• Central: Hainault, Ruislip, White City
• Circle: Hammersmith
• District: Ealing Common, Hammersmith, Upminster
• Hammersmith & City: Hammersmith
• Jubilee: Neasden, Stratford Market
• Metropolitan: Neasden
• Northern: Edgware, Golders Green, Highgate, Morden
• Piccadilly: Cockfosters, Northfields
• Victoria: Northumberland Park
• Waterloo & City: Waterloo
• London Underground: Acton Works, Lillie Bridge
Disused and abandoned stations
In the years since the first parts of the London Underground opened, many stations and routes have been closed. Some stations were closed because of low passenger numbers rendering them uneconomical; some became redundant after lines were re-routed or replacements were constructed; and others are no longer served by the Underground but remain open to National Rail main line services. In some cases, such as Aldwych, the buildings remain and are used for other purposes. In others, such as British Museum, all evidence of the station has been lost through demolition.
Ventilation and cooling
When the Bakerloo line opened in 1906 it was advertised with a maximum temperature of 60 °F (16 °C), but over time the tube tunnels have warmed up. In 1938 approval was given for a ventilation improvement programme, and a refrigeration unit was installed in a lift shaft at Tottenham Court Road. Temperatures of 47 °C (117 °F) were reported in the 2006 European heat wave. It was claimed in 2002 that, if animals were being transported, temperatures on the Tube would break European Commission animal welfare laws. A 2000 study reported that air quality was seventy-three times worse than at street level, with a passenger breathing the same mass of particulates during a twenty-minute journey on the Northern line as when smoking a cigarette. The main purpose of the London Underground's ventilation fans is to extract hot air from the tunnels, and fans across the network are being refurbished, although complaints of noise from local residents preclude their use at full power at night.
In June 2006 a groundwater cooling system was installed at Victoria station. In 2012, air-cooling units were installed on platforms at Green Park station using cool deep groundwater and at Oxford Circus using chiller units at the top of an adjacent building. New air-conditioned trains are being introduced on the sub-surface lines, but space is limited on tube trains for air-conditioning units and these would heat the tunnels even more. The Deep Tube Programme, investigating replacing the trains for the Bakerloo, Central, Waterloo and City and Piccadilly lines, is looking for trains with better energy conservation and regenerative braking, on which it might be possible to install a form of air conditioning.
In the original Tube design, trains passing through close fitting tunnels act as pistons to create air pressure gradients between stations. This pressure difference drives ventilation between platforms and the surface exits through the passenger foot network. This system depends on adequate cross sectional area of the airspace above the passengers’ heads in the foot tunnels and escalators, where laminar airflow is proportional to the fourth power of the radius, the Hagen–Poiseuille equation. It also depends on an absence of turbulence in the tunnel headspace. In many stations the ventilation system is now ineffective because of alterations that reduce tunnel diameters and increase turbulence. An example is Green Park tube station, where false ceiling panels attached to metal frames have been installed that reduce the above-head airspace diameter by more than half in many parts. This has the effect of reducing laminar airflow by 94%.
Originally air turbulence was kept to a minimum by keeping all signage flat to the tunnel walls. Now the ventilation space above head height is crowded with ducting, conduits, cameras, speakers and equipment acting as a baffle plates with predictable reductions in flow. Often electronic signs have their flat surface at right angles to the main air flow, causing choked flow. Temporary sign boards that stand at the top of escalators also maximise turbulence. The alterations to the ventilation system are important, not only to heat exchange, but also the quality of the air at platform level, particularly given its asbestos content.
Lifts and escalators
Originally access to the deep-tube platforms was by a lift. Each lift was staffed, and at some quiet stations in the 1920s the ticket office was moved into the lift, or it was arranged that the lift could be controlled from the ticket office. The first escalator on the London Underground was installed in 1911 between the District and Piccadilly platforms at Earl's Court and from the following year new deep-level stations were provided with escalators instead of lifts. The escalators had a diagonal shunt at the top landing. In 1921 a recorded voice instructed passengers to stand on the right and signs followed in World War II. Travellers were asked to stand on the right so that anyone wishing to overtake them would have a clear passage on the left side of the escalator. The first 'comb' type escalator was installed in 1924 at Clapham Common. In the 1920s and 1930s many lifts were replaced by escalators. After the fatal 1987 King's Cross fire, all wooden escalators were replaced with metal ones and the mechanisms are regularly degreased to lower the potential for fires. The only wooden escalator not to be replaced was at Greenford station, which remained until March 2014 when TfL replaced it with the first incline lift on the UK transport network in October 2015.
There are 426 escalators on the London Underground system and the longest, at 60 metres (200 ft), is at Angel. The shortest, at Stratford, gi
Snake Moan
Bangbros Full Video 4k
Spitting Porn Vk
Sperma Penis
Small White Dicks
Tube - Transport for London
London Underground - Wikipedia
Underground / Subway / Metro / Tube —[Multimedia-English ...
List of London Underground stations - Wikipedia
Underground Tubes