Little Known Facts About Commercial Property and Building Inspection in Colorado.

(A minimum 10' head is required when testing with water)- Demand the inspection when all under flooring water piping is set up and under pressure test, but not covered.- Demand the assessment when the channel or cable television is set up, but not covered.- Request the examination when all outside sheathing, wall bracing, strapping and hold-downs are complete, but prior to the weather-resistive barrier being installed.- (Includes process piping.) Ask for the assessment when all rough-in mechanical work is installed, however not covered.

- Prior to any system of piping is put in service or concealed, it will be checked to ensure that it is gas tight. The test pressure to be utilized will be no less than 1 1/2 times the proposed optimum working pressure.- Demand the evaluation when all rough-in electrical/conduit is installed, but not covered.- Request the examination when the structure is "dried in" and all framing members, gussets, shear panels, windows, anchors and all plumbing, mechanical and electrical rough-ins are in location, however prior to being covered.- Demand the evaluation when needed insulation, including duct, RC channel, and so on.

Plumbing that is capped off will be checked prior to covering. Answers Shown Here and water lines shall be capped within 5 feet of the property line and checked prior to covering.- Demand the assessment when the structure is completed to the requirements of the authorized plans, specs and the City of Brighton Codes.

Commercial Services - Licensed Inspector Northern Colorado

Home Inspectors in Woodland Park, Colorado (Teller County)

About Commercial Property and Building Inspection in Colorado

- Demand the examination once the underlayment, flashings, battens (if relevant), and insulation board (if relevant) have actually been set up, however prior to the positioning of any shingles, tiles, or other final roof coverings. To learn more, please call 303-655-2017 or email the Building Authorization Counter..