In HVT (Hollywood Technology), any voltage above 11 kilo-volts is regarded as inside the high profile range. It can either be alternating or direct current. Tastes industries are offered using this range of voltages from the national grid while many generates their unique high voltage power using power generators. Extremely high voltages usually are stepped down to some specific lower voltages, to run their electrical machinery for example motors, heaters, HVAC systems, and the like. Of these industries, regular checks has to be conducted by authorized personnel to gauge the condition of their equipment. Equipment exams are very essential in determining the steadiness of a machine so as to avoid equipment breakdown and big production losses. These tests also assist in determining in case a newly purchased tools are worth, before installing it. Most manufacturers use high profile testing to test the insulation with their equipment before supplying them to their customers.

Some great benefits of applying high voltage insulation testing are often looked down upon by so many industries, being a manner of finding out the conditionality of the electrical equipment. This is often greatly caused by the fact that much pressure and emphasis is always placed on production activities in the cost of proactive repair of the apparatus. The best and efficient insulation with an electrical machine is most important for the correct operation each time. Since insulation of it technology degrades with time, the respective electrical department for almost any industry must be regularly conducting regular check-ups for machines in their normal working schedule. Do this to even low and medium voltage systems.

Generally, a four stage process is followed. The stages are briefly described below:

In-process testing

Here is the most rudimentry process which may be done even around the readily installed equipment, providing that it's not running. This process requires the usage of a meggering instrument to test the insulation integrity in the coils before it's linked to phases, neutral, and earth. Sometimes, a multimeter doubles. Inter-winding and winding-to-body resistances are checked at this time. Therefore, the dielectric withstanding voltage and insulation resistance of the coil can be discovered.

Ancillary Equipment Testing

This requires testing for insulation resistance and dielectric withstanding voltage for interconnecting cables, high voltage bushings, busbars, and terminations. This could be conducted if the components are interconnected or separated.

Generator Assembly Test

In this instance the generator is visually inspected. Cleaning is done along with the machine's stability is additionally assessed. The heartbeat of the machine is observed at close range employing a special display instrument. The apparatus is additionally meggered for insulation resistance and dielectric withstanding voltage test.

Among the things to consider in testing equipment are; voltage and right testing equipment. For the best dependable results testing voltage ought to be enough to effectively look at the insulating resistance. However, it should not be too high to overstress the apparatus insulation. The right testing equipment which can effectively store results allows them to be saved in your personal computer for archiving and analysis. This process saves some time to cuts down on the probability of error.