Night Tube

⚡ 👉🏻👉🏻👉🏻 INFORMATION AVAILABLE CLICK HERE 👈🏻👈🏻👈🏻
The Night Tube and London Overground Night Service, often referred to simply as Night Tube is a service pattern on the London Underground and London Overground systems which provides through the night services to travellers on Friday and Saturday nights on the Central, Jubilee, Northern, Piccadilly, and Victoria lines, and a short section of the London Overground’s East London line. The service began on the night of Friday 19 August 2016, providing 24 hour service on these routes from Friday morning to Sunday evening each weekend. It was suspended from Friday 20 March 2020 because of the COVID-19 pandemic and will not restart until at least 2022.
Since the London Underground's inception, the practice of running night-time services has been difficult, mainly due to night-time noise factors,[citation needed] and the ongoing maintenance works that usually occur during the night. General mass upgrades to the overall London Underground network from the late-1990s onwards, along with large infrastructure improvements to stations and signalling,[1][note 1] plus the building of Crossrail (with the future probability of Crossrail 2) which will have sections going underground to connect with the main London Underground system, made it possible to introduce a limited night-time Tube service.
TfL announced in mid-2014 the introduction of the Night Tube. The initial plans were for Friday and Saturday through the night services on a limited number of lines, with, on average, a train every 10 minutes or less, continuing from around midnight when train services usually close to around 5 a.m. and into the usual morning service.[11][12][13]
The planned service was on the whole of the Jubilee and Victoria lines. In addition to that, there was planned services on the Central line between Ealing Broadway and Hainault or Loughton, the Northern line between Morden and Edgware or High Barnet via Charing Cross,[note 2] and the Piccadilly line between Cockfosters and Heathrow Terminal 5.[15][note 3] The service was scheduled to launch on 11/12 September 2015,[17][18][19] with the prospect of expansion across further lines in subsequent years. However, due to strike action, the start of the Night Tube was postponed until 18 August 2016.[20][21]
Members of several unions decided to take strike action in relation to the terms and conditions being offered by London Underground, largely regarding agreements specifically over the pay deal and hours worked by new Night Tube service personnel. Members of the National Union of Rail, Maritime and Transport Workers (RMT), Transport Salaried Staffs' Association (TSSA), and Unite officially started the first 24-hour strike at 18:30 BST on 8 July 2015, and the Associated Society of Locomotive Engineers and Firemen (ASLEF) drivers starting their 24-hour action from 21:30 BST on 8 July 2015, with disruption occurring several hours either side of the start and finish times. London Underground warned there could be no services on Thursday as a result of the walk-out. The strike affected all Tube lines and finished at 21:30 BST on 9 July 2015.[22] A second 24-hour strike action by London Underground trade unions took place from 18:30 BST on 5 August 2015 until 05:00 BST on 7 August 2015, and there was no service at all on 6 August 2015.[23]
Three unions also threatened to strike on 25 and 27 August 2015, where talks were held between the unions and London Underground for negotiations. ASLEF decided not to participate in the planned strikes.[20][21] On 27 August 2015, it was announced that the start date for the Night Tube had been pushed back due to ongoing talks about contract terms between trade unions and London Underground.[24] Following agreement of new terms by TfL and the unions, Night Tube operations were confirmed to start in the second half of 2016.
The first Night Tube train ran on the night of Friday 19 August 2016, with the Central and Victoria line services starting that night.[25] The Jubilee line services started on 7 October 2016,[26] the Northern line on 18 November 2016[27][note 4] and the Piccadilly line on 16 December 2016.[29][30]
On 15 December 2017 the London Overground started the East London line night service running between Dalston junction and New Cross Gate. This was extended to Highbury & Islington on 23 February 2018.
Night Tube services were suspended from Friday 20 March 2020, during the COVID-19 pandemic.[31] It was planned to restart in Spring 2021,[32] however in April 2021 it was revealed the service would stay closed until at least 2022.[33]
The current typical Night Tube services are as follows:[12][15]
Ealing Broadway (westbound)
/ White City (eastbound)
- Loughton
West Acton (westbound-only), North Acton (westbound-only), East Acton (westbound-only), White City, Shepherd's Bush, Holland Park, Notting Hill Gate, Queensway, Lancaster Gate, Marble Arch, Bond Street, Oxford Circus, Tottenham Court Road, Holborn, Chancery Lane, St. Paul's, Bank, Liverpool Street, Bethnal Green, Mile End, Stratford, Leyton, Leytonstone, Snaresbrook, South Woodford, Woodford, Buckhurst Hill
High Barnet - Morden via Charing Cross
Totteridge & Whetstone, Woodside Park, West Finchley, Finchley Central, East Finchley, Highgate, Archway, Tufnell Park, Kentish Town, Camden Town, Mornington Crescent, Euston, Warren Street, Goodge Street, Tottenham Court Road, Leicester Square, Charing Cross, Embankment, Waterloo, Kennington, Oval, Stockwell, Clapham North, Clapham Common, Clapham South, Balham, Tooting Bec, Tooting Broadway, Colliers Wood, South Wimbledon
Blackhorse Road, Tottenham Hale, Seven Sisters, Finsbury Park, Highbury & Islington, King's Cross St Pancras, Euston, Warren Street, Oxford Circus, Green Park, Victoria, Pimlico, Vauxhall, Stockwell
Highbury & Islington -
New Cross Gate
^ a b Central line services combine between White City and Leytonstone to run 6tph / every 10 minutes. Services between Ealing Broadway and White City run 3tph / every 20 minutes, going to Hainault, but coming from Loughton.[34]
^ a b Northern line services combine between Camden Town and Morden to run 8tph / every 7-8 minutes. All trains operate between Camden Town and Kennington via the Charing Cross branch.
TfL estimated that the Night Tube would lead to the creation of 1,965 permanent jobs, the net additional output produced as a result equating to an additional £360m over 30 years (i.e. £12m per year). These include:[12]
In addition to the above quantifiable benefits, other benefits TfL believe the service is likely to deliver include:[12]
^ These include the Jubilee, Northern, Piccadilly and Victoria line capacity upgrades.[2][3][4][5] Upgrades to major stations include Green Park and King's Cross St. Pancras,[1][6][7][8] while others had improvements such as addition of Help Points, new induction loops to assist hearing-impaired passengers and step-free access.[9][10]
^ The Bank branch is not served by Night Tube due to nighttime construction on that branch, in relation to the Bank station upgrade.[14]
^ The initial plans did not include the Central line between Leytonstone and Loughton (as of 9 December 2014).[16]
^ Night Tube services did not stop at Charing Cross until 29 June 2017 due to improvement works on the Northern line ticket hall.[28]
Content is available under CC BY-SA 3.0 unless otherwise noted.
We just need to check something, can you please follow the instructions below?
Amateur Old Anal
Sissy Shopping
Rajce Boy Penis
Lela Star Anal Sex
Male Spy Pissing
Night Tube - Wikipedia
The Night Tube - Transport for London
The Night Tube | London City Hall
Night Tube and London Overground map - Transport for London
The Night Tube - Getting Around London - visitlondon.com
Everything You Need To Know About The Night Tube | Londonist
Night Tube to be suspended until March 2021 : CityAM
Night Tube



















































