German Panther

🛑 👉🏻👉🏻👉🏻 INFORMATION AVAILABLE CLICK HERE👈🏻👈🏻👈🏻
This article is about the German World War II tank. For the modern South Korean tank, see K2 Black Panther.
"Panzer V" redirects here. For the Rheinmetall PzKpfw NbFz V prototype tank, see Neubaufahrzeug.
The Panther is a German medium tank deployed during World War II on the Eastern and Western Fronts in Europe from mid-1943 to the war's end in 1945. It had the ordnance inventory designation of Sd.Kfz. 171. It was designated as the Panzerkampfwagen V Panther until 27 February 1944, when Hitler ordered that the Roman numeral "V" be deleted.[citation needed] Contemporary English language reports sometimes refer to it as the "Mark V".
Panther Ausf. D tanks, 1943. The D model can best be recognized by the drum-shaped cupola and/or the "Letterbox" hull machine gun slot.
1943–1945 (Nazi Germany)
1944–1949 (France)
117,100 Reichmarks (Without weapons, optics, or radio)
176,100 Reichmarks (combat ready)[1]
1943–1945 (1946- 9 postwar for the British Army)
Ausf. D, Ausf. A, Ausf. G, Befehlspanzer (command tank), Beobachtungspanzer (artillery observer vehicle), Bergepanther (armoured recovery vehicle)
6.87 m (22 ft 6 in)
8.66 metres (28 ft 5 in) gun forward[3]
3.27 m (10 ft 9 in)[3]
3.42 m (11 ft 3 in) with skirts
5 (driver, radio-operator/hull machine gunner, commander, gunner, loader)
2 × 7.92 mm MG 34 machine guns
with 5,100 rounds
V-12 petrol Maybach HL230 P30[3]
700 PS (690 hp, 515 kW)
15.39 PS (11.5 kW)/tonne (13.77 hp/ton)
ZF AK 7-200. 7 forward 1 reverse[3]
double torsion bar, interleaved road wheels
720 litres (160 imp gal; 190 US gal)
Road: 200 km (120 mi)
Cross-country: 100 km (62 mi) [4]
55 km/h (34 mph) (first models)
46 km/h (29 mph) (later models)
The Panther was intended to counter the Soviet T-34 and to replace the Panzer III and Panzer IV. Nevertheless, it served alongside the Panzer IV and the heavier Tiger I until the end of the war. It is considered one of the best tanks of World War II for its excellent firepower and protection, although its reliability was less impressive.[5]
The Panther was a compromise. While having essentially the same Maybach V12 petrol (690 hp) engine as the Tiger I, it had more effective frontal hull armour,[6] better gun penetration, was lighter and faster, and could traverse rough terrain better than the Tiger I. The trade-off was weaker side armour, which made it vulnerable to flanking fire. The Panther proved to be effective in open country and long range engagements.[7]
The Panther was far cheaper to produce than the Tiger I, and only slightly more expensive than the Panzer IV. Key elements of the Panther design, such as its armour, transmission, and final drive, were simplifications made to improve production rates and address raw material shortages. The overall design remained described by some as "over-engineered".[8][9] The Panther was rushed into combat at the Battle of Kursk in the summer of 1943 despite numerous unresolved technical problems, leading to high losses due to mechanical failure. Most design flaws were rectified by late 1943 and early 1944, though the bombing of production plants, increasing shortages of high quality alloys for critical components, shortage of fuel and training space, and the declining quality of crews all impacted the tank's effectiveness.
Though officially classified as a medium tank, its weight is more like that of a heavy tank, as its weight of 44.8 tons puts it roughly in the same category as the American M26 Pershing (41.7 tons), British Churchill (40.7 tons) and the Soviet IS-2 (46 tons) heavy tanks. The tank had a very high power-to-weight ratio, making it highly mobile regardless of its tonnage. Its weight still caused logistical problems, such as an inability to cross certain bridges.
The naming of Panther production variants did not, unlike most German tanks, follow alphabetical order: the initial variant, Panther "D" (Ausf. D), was followed by "A" and "G" variants.
The Panther was born out of a project started in 1938 to replace the Panzer III and Panzer IV tanks. The initial requirements of the VK 20 series called for a fully tracked vehicle weighing 20 tonnes and design proposals by Krupp, Daimler Benz and MAN ensued. These designs were abandoned and Krupp dropped out of the competition entirely as the requirements increased to a vehicle weighing 30 tonnes, a direct reaction to the encounters with the Soviet T-34 and KV-1 tanks and against the advice of Wa Pruef 6.[Notes 1][10] The T-34 outclassed the existing models of the Panzer III and IV.[11][12] At the insistence of General Heinz Guderian, a special tank commission was created to assess the T-34.[13] Among the features of the Soviet tank considered most significant were the sloping armour, which gave much improved shot deflection and also increased the effective armour thickness against penetration, the wide track, which improved mobility over soft ground, and the 76.2 mm (3 in) gun, which had good armour penetration and fired an effective high explosive round. Daimler-Benz (DB), which designed the successful Panzer III and StuG III, and Maschinenfabrik Augsburg-Nürnberg AG (MAN) were given the task of designing a new 30- to 35-tonne tank, designated VK 30.02, by April 1942.
The "VK 30.02(DB)" design resembled the T-34 in its hull and turret and was also to be powered by a diesel engine. It was driven from the rear drive sprocket with the turret situated forward. The incorporation of a diesel engine promised increased operational range, reduced flammability and allowed for better use of petroleum reserves. Hitler himself considered a diesel engine imperative for the new tank.[14] DB's proposal used an external leaf spring suspension, in contrast to the MAN proposal of twin torsion bars. Wa Pruef 6's opinion was that the leaf spring suspension was a disadvantage and that using torsion bars would allow greater internal hull width. It also opposed the rear drive because of the potential for track fouling. Daimler Benz still preferred the leaf springs over a torsion bar suspension as it resulted in a silhouette about 200 mm (7.9 in) shorter and rendered complex shock absorbers unnecessary. The employment of a rear drive provided additional crew space and also allowed for a better slope on the front hull, which was considered important in preventing penetration by armour-piercing shells.[10]
The MAN design embodied a more conventional configuration, with the transmission and drive sprocket in the front and a centrally mounted turret. It had a petrol engine and eight torsion-bar suspension axles per side. Because of the torsion bar suspension and the drive shaft running under the turret basket, the MAN Panther was higher and had a wider hull than the DB design. The Henschel company's design concepts for their Tiger I tank's suspension/drive components, using its characteristic Schachtellaufwerk format – large, overlapping, interleaved road wheels with a "slack-track" using no return rollers for the upper run of track, also features shared with almost all German military half-track designs since the late 1930s – were repeated with the MAN design for the Panther. These multiple large, rubber-rimmed steel wheels distributed ground pressure more evenly across the track. The MAN proposal also complemented Rheinmetall's already designed turret modified from that of the VK 45.01 (H),[15] and used a virtually identical Maybach V12 engine to the Tiger I heavy tank's Maybach HL230 powerplant model.
The two designs were reviewed from January to March 1942. Reichminister Todt, and later, his replacement Albert Speer, both recommended the DB design to Hitler because of its advantages over the initial MAN design. At the final submission, MAN refined its design, having learned from the DB proposal apparently through a leak by a former employee in the Wa Pruef 6, senior engineer Heinrich Ernst Kniepkamp and others.[14] On 5 March 1942, Albert Speer reported that Hitler considered the Daimler-Benz design to be superior to MAN's design.[16] A review by a special commission appointed by Hitler in May 1942 selected the MAN design. Hitler approved this decision after reviewing it overnight. One of the principal reasons given for this decision was that the MAN design used an existing turret designed by Rheinmetall-Borsig, while the DB design would have required a brand new turret and engine to be designed and produced, delaying the commencement of production.[17] This time-saving measure compromised the subsequent development of the design.[18]
Albert Speer recounts in his autobiography Inside the Third Reich
Since the Tiger had originally been designed to weigh fifty tons but as a result of Hitler's demands had gone up to fifty seven tons, we decided to develop a new thirty ton tank whose very name, Panther, was to signify greater agility. Though light in weight, its motor was to be the same as the Tiger's, which meant it could develop superior speed. But in the course of a year Hitler once again insisted on clapping so much armor on it, as well as larger guns, that it ultimately reached forty eight tons, the original weight of the Tiger.[19]
A mild steel prototype of the MAN design was produced by September 1942 and, after testing at Kummersdorf, was officially accepted. It was put into immediate production. The start of production was delayed, mainly because of a shortage of specialized machine tools needed for the machining of the hull. Finished tanks were produced in December and suffered from reliability problems as a result. The demand for this tank was so high that the manufacturing was soon expanded beyond MAN to include Daimler-Benz (Berlin-Marienfelde, former DMG plant), Maschinenfabrik Niedersachsen Hanover (MNH, subsidiary of Eisenwerk Wülfel/Hanomag) and the Tiger I's original designer, Henschel & Sohn in Kassel.
The initial production target was 250 tanks per month at the MAN plant at Nuremberg. This was increased to 600 per month in January 1943. Despite determined efforts, this figure was never reached due to disruption by Allied bombing, and manufacturing and resource bottlenecks. Production in 1943 averaged 148 per month. In 1944, it averaged 315 a month (3,777 having been built that year), peaking with 380 in July and ending around the end of March 1945, with at least 6,000 built in total. Front-line combat strength peaked on 1 September 1944 at 2,304 tanks, but that same month a record number of 692 tanks were reported lost.[2]
The Allies directed bombing at the common chokepoint for both Panther and Tiger production: the Maybach engine plant. This was bombed the night of 27/28 April 1944 and production halted for five months. A second factory had already been planned, the Auto Union Siegmar plant (the former Wanderer car factory), and this came on line in May 1944.[20] The targeting of Panther factories began with a bombing raid on the DB plant on 6 August 1944, and again on the night of 23/24 August. MAN was struck on 10 September, 3 October and 19 October 1944, and then again on 3 January and 20/21 February 1945. MNH was not attacked until 14 and 28 March 1945.[21]
In addition to interfering with tank production goals, the bombing forced a steep drop in the production of spare parts, which as a percentage of tank production dropped from 25–30 percent in 1943 to 8 percent in late 1944. This compounded the problems with reliability and with the numbers of operational Panthers, as tanks in the field had to be cannibalized for parts.[22]
The Panther was the third most produced German armoured fighting vehicle, after the Sturmgeschütz III assault gun/tank destroyer at 9,408 units, and the Panzer IV tank at 8,298 units.
Converted on the production line[citation needed]
61 more converted from rebuilt chassis
Maschinenfabrik Augsburg-Nürnberg (M.A.N.)
Maschinenfabrik Niedersachsen-Hannover
A Panther tank cost 117,100 Reichmarks (RM) to produce.[25] This compares with 82,500 RM for the StuG III, 96,163 RM for the Panzer III, 103,462 RM for the Panzer IV, and 250,800 RM for the Tiger I. These figures did not include the cost of the armament and radio.[26][27] Using slave labour on the production lines greatly reduced costs, but also greatly increased the risk of sabotage. French-army studies in 1947 found that many Panthers had been sabotaged during production.[28] The Germans increasingly strove for production methods that would allow higher production rates and lower cost. By comparison the total cost of the early production Tiger I in 1942–1943 has been stated to be as high as 800,000 RM.[29]
The process of streamlining the production of German armoured fighting vehicles first began after Speer became a Reichminister in early 1942, and steadily accelerated through to 1944; the production of the Panther tank coincided with this period of increased manufacturing-efficiency. At the beginning of the war, German armoured fighting vehicle manufacturers had employed labour-intensive and costly manufacturing methods unsuitable for the needs of mass production; even with streamlined production methods, Germany never approached the efficiency of Allied manufacturing during World War II.[30]
The weight of the production model was increased to 45 tonnes from the original plans for a 35 tonne tank. Hitler was briefed thoroughly on the comparison between the MAN and DB designs in the report by Guderian's tank commission. Armour protection appeared to be inadequate, while "the motor mounted on the rear appeared to him correct". He agreed that the "decisive factor was the possibility of quickly getting the tank into production". On 15 May 1942, Oberst Fichtner informed MAN that Hitler had decided in favour of the MAN Panther and ordered series production. The upper glacis plate was to be increased from 60 mm (2.4 in) to 80 mm (3.1 in). Hitler demanded that an increase to 100 mm (3.9 in) should be attempted and that at least all vertical surfaces were to be 100 mm (3.9 in); the turret front plate was increased from 80 mm (3.1 in) to 100 mm (3.9 in).[15]
The Panther was rushed into combat before all of its teething problems had been corrected. Reliability was considerably improved over time, and the Panther proved to be a very effective fighting vehicle,[31] but some design flaws, such as its weak final drive units, were never corrected.
The crew had five members: driver, radio operator (who also fired the bow machine gun), gunner, loader, and commander.
The first 250 Panthers were powered by a Maybach HL 210 P30 V-12 petrol engine, which delivered 650 metric hp at 3,000 rpm and had three simple air filters.[32][Notes 2] Starting in May 1943, Panthers were built using the 700 metric horsepower (690 hp, 515 kW) at 3,000 rpm, 23.1 litre Maybach HL 230 P30 V-12 petrol engine. To save aluminium, the light alloy block used in the HL 210 was replaced by a cast iron block. Two multistage "cyclone" air filters were used to improve dust removal.[34][35] Due to the use of low grade petrol, the engine power output was reduced. With a capacity of 730 litres (160 imperial gallons; 190 US gallons) of fuel, a fully fuelled Panther's range was 200 km (120 mi) on surfaced roads and 100 km (62 mi) cross country.[4]
The HL 230 P30 engine was a very compact tunnel crankcase design, and it kept the space between the cylinder walls to a minimum. The crankshaft was composed of seven "discs" or main journals, each with an outer race of roller bearings, and a crankshaft pin between each disc. To reduce the length of the engine by an inch or so, and reduce unbalanced rocking moment caused by a normal offset-Vee type engine, the two banks of 6 cylinders of the V-12 were not offset – the "big ends" of the connecting rods of each cylinder pair in the "V" where they mated with the crankpin were thus at the same spot with respect to the engine block's length rather than offset; this required a "fork and blade" matched pair of connecting rods for each transversely oriented pair of cylinders. Usually, "V"-form engines have their transversely paired cylinders' connecting rods' "big ends" simply placed side by side on the crankpin, with their transverse pairs of cylinders offset slightly to allow the connecting rod big ends to attach side by side while still being in the cylinder bore centerline. This compact arrangement with the connecting rods was the source of considerable problems initially.[36] Blown head gaskets were another problem, which was corrected with improved seals in September 1943. Improved bearings were introduced in November 1943. An engine governor was also added in November 1943 that reduced the maximum engine speed to 2,500 rpm. An eighth crankshaft bearing was added beginning in January 1944 to reduce motor failures.[37]
The engine compartment was designed to be watertight so that the Panther could ford water obstacles; however, this made the engine compartment poorly ventilated and prone to overheating. The fuel connectors in early Panthers were not insulated, leading to the leakage of fuel fumes into the engine compartment, which caused engine fires. Additional ventilation was added to draw off these gases, which only partly solved the problem of engine fires.[38] Other measures taken to reduce this problem included improving the coolant circulation inside the motor and adding a reinforced membrane spring to the fuel pump.[39] Despite the risks of fire, the fighting compartment was relatively safe due to a solid firewall that separated it from the engine compartment.[40]
Engine reliability improved over time. A French assessment in 1947 of their stock of captured Normandy Panther A tanks concluded that the engine had an average life of 1,000 km (620 mi) and maximum life of 1,500 km (930 mi).[41]
The suspension consisted of front drive sprockets, rear idlers and eight double-interleaved rubber-rimmed steel road wheels on each side – in the so-called Schachtellaufwerk design, suspended on a dual torsion bar suspension. The dual torsion bar system, designed by Professor Ernst Lehr, allowed for a wide travel stroke and rapid oscillations with high reliability, thus allowing for relatively high speed travel over undulating terrain. The extra space required for the bars running across the length of the bottom of the hull, below the turret basket, increased the overall height of the tank. When damaged by mines, the torsion bars often required a welding torch for removal.[42]
The Panther's suspension was overengineered, and the Schachtellaufwerk interleaved road wheel system made replacing inner road wheels time-consuming (though it could operate with missing or broken wheels). The interleaved wheels also had a tendency to become clogged with mud, rocks and ice, and could freeze solid overnight in the harsh winter weather that followed the autumn rasputitsa mud season on the Eastern Front. Shell damage could cause the road wheels to jam together and become difficult to separate.[43] Inte
Pov Dildo Teens
Best Porn Daddy
Female Region
Porno Ebony Shemale
Big Ass Ebony Girl
Panther tank - Wikipedia
Радиоуправляемый танк German Panther 1:16 40Mhz He…
World War II German Panther Medium Tank - ThoughtCo
A Look Inside The Most Feared Tank Of WWII, The Panther
The Formidable Panzer V "Panther" with 25 Photos
Panzer V Panther - Tank Encyclopedia
German Panther





































































