CONSTRUCTION OF UZBEKISTAN GTL PLANT RAILWAY INFRASTRUCTURE HAS BEEN LAUNCHED

CONSTRUCTION OF UZBEKISTAN GTL PLANT RAILWAY INFRASTRUCTURE HAS BEEN LAUNCHED

https://t.me/uzbgtl

On March 27, 2020, construction of the plant railway infrastructure was launched at the construction site of the GTL plant in Kashkadarya region, as part of the "Production of synthetic liquid fuel based on purified methane of Shurtan Gas Chemical Complex" Investment Project.

According to the Project, a total of over 11 km of railway tracks will be built, including 6.5 km to be built within the Plant area, with 4 overpasses allowing to maintain up to 8 tank cars and accept up to 32 tank cars all at the same time.

The railway infrastructure is being constructed by professionals - specialists of Uzbekiston Temir Yullari JSC", by order of  Shurtan GCC and through extensive collaboration of Uzbekistan GTL LLC and Uzbekneftegaz JSC specialists.

As of March 30, 1.6 km of internal railway tracks have already been built.

The railway infrastructure under construction will ensure annual shipment of up to 1.5 million tons of high-quality and environmentally friendly oil products under Oltin Yo'l GTL trade mark from Uzbekistan GTL Plant to the domestic market and for export.

Despite the current epidemiological situation in Uzbekistan and all over the world, construction of the largest plant for production of synthetic liquid fuel in the region is in progress, with all necessary preventive measures taken to protect the life and health of every employee involved in implementation of this strategically important project


Press center of Uzbekistan GTL



Report Page