Biogen Systems have Just Carried Out an Overhaul of a 2015 E3 V1.0 System

Biogen Systems have Just Carried Out an Overhaul of a 2015 E3 V1.0 System

David

Biogen Systems have just carried out an overhaul of a 2015 E3 V1.0 system . The unit was removed from site , returned to our UK Service Centre at Chester


and underwent fitting of the E3 V2.0 uprate pack, which includes:

• Pulse Jet Filter

• Engine Oil cooling

• Modifications to move the user scheduled intervention to a weekly basis from the original 48 hours

• Pellet fines removal system

The removal , uprate and recommissioning took 2 weeks and the unit is now back on line in Herefordshire, UK.

Biogen Systems Limited and its sister company in Bavaria Entrenco Gmbh provide modular 200 KW Biomass Combined and Heat Power systems to customers Globally.

If you have an E3 V1.0 and are interested in discussing how its performance can be improved contact Julian Ackerley via julian.ackerley@biogensystems.co.uk

Original Source: Biomass CHP Systems