7 Steps to Install Your Cubicles

7 Steps to Install Your Cubicles


It is essential when installing toilet or shower cubicles to check out procedures. Preparation is key and to over look these simple instructions may cause big problems down the road in the installation process. Now be sure to have got all the constituents needed to install your cubicle. Just follow these obvious to see instructions, making sure your lines are vertical because you have areas like floors or walls, which is often away from true, plus your cubicles is going to be installed in virtually no time whatsoever.

Step 1 Measuring up

Measure and mark off a vertical line for the back wall for that positions in the wall partitions for that cubicles. Mark about the wall the positions to correct the three back wall brackets.

Step 2 Fitting Brackets

Fix these back wall channel brackets as essential for each partition around the vertical line drawn on the wall.

Step 3 Fitting Partitions

Position the wall panels into the brackets and make certain the partition is level with all the adjustable legs fixed for the wall panels.

Draw Build Your Own Soundproof Room With Acoustic Wall Panels from the holes inside the channel brackets about the walls of each one partition ready for drilling. Drill the outlet employing a 10mm drill bit and fix the brackets for the partition walls while using T-nuts provided.

Step 4 Fitting Partition Support

Check the attached the adjustable leg for the partition, and adjust to correct height. Ensure the partition is aligned correctly and connect adjustable legs to the floor.

Step 5 Fitting Fascia Panels

Measure up and mark off a vertical line on the side wall if fixing with a wall. Fix the three wall brackets the wall. Make sure the hinge panel is level and mark off of the positions with the 3 brackets about the fascia. Fix the hinge wall to fascia channel brackets while using the T-nuts provided. Your pilaster (central fascia panel) will have the hinge holes pre-drilled and just fix those using the T-nuts provided.

Step 6 Fitting Head Rail

With the partitions and fascia fixed the pinnacle rail should be placed in position within the tops from the fascia bridging the threshold gap. Fix your head rail permanently by attaching towards the fascia.

Step 7 Fitting the doors, hinges and lock assembly

Attach the hinges to the doors. Attach the indicator bolt on the door. Block the doors up for the level with the hinge panel bottom using wood and place the threshold about the blocks. Engage the lock and mark from the indicator bolt about the fascia in the point you need to attach the keep. Mark off of the hinge placement around the hinge panel. To drill the hinge holes eliminate the nut at the bottom of the hinge and reassemble and fasten the hinges to the walls ensuring the threshold is hung horizontal. Unlock the indicator bolt and fasten the keep with all the fixings provided. Set back the plastic sleeves in the hinge for your door to close closed or open.

Report Page